Log In Sign Up
News Wire / science

Pinglu Canal Project Installs Water Control Gates

CNR Voice of China Dalian 10d10d Impact 5
The Pinglu Canal project has implemented specific solutions to manage complex water flows from over 30 tributaries. The canal is expected to be operational after its completion, with the goal of connecting waterways and facilitating smoother water integration.

Topics

infrastructure water management Pinglu Canal

Developing

  1. 862d Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore.
  2. 862d Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur.
  3. 862d Excepteur sint occaecat cupidatat non proident, sunt in culpa qui officia deserunt mollit anim id est.
  4. 862d Sed ut perspiciatis unde omnis iste natus error sit voluptatem accusantium doloremque laudantium.

Sources · 7 independent

CNR Voice of China

“The Pinglu Canal has more than 30 tributaries... Wei Dejian said... we use sand ridges plus our leap plus our sedimentation tanks to solve the problem of steep bends.”

CNR Voice of China

“The Pinglu Canal has more than 30 tributaries, just like more than 30 reservoirs of different sizes all flowing into this main canal reservoir.”

CNR Voice of China

“The Pinglu Canal has more than 30 tributaries... we use sand ridges and our sedimentation tanks to solve the problem of rapid bends in the Shaping River.”

CNR Voice of China

“Among them are tributaries flowing in from mountain forests. These tributaries, including the surrounding ecological impact, will be resolved within a small range as much as possible.”

CNR Voice of China

“平鲁运河集团总工程师,国家重点研发计划,跨流域运河环境地影响建设技术项目负责人,韦德剑告诉中国之声。其中就有从山地秋林汇入过来的支流。这些支流 包括周边的生态影响,尽可能在小范围内解决。但如果遇到弯急、水流复杂的情况,又该怎么办呢?于塔给出了针对性的解决方案。”

CNR Voice of China

“平鲁运河集团总工程师,国家重点研发计划,跨流域运河环境地影响建设技术项目负责人,韦德剑告诉中国之声。其中就有从山地秋林汇入过来的支流。”

CNR Voice of China

“其中就有从山地秋林汇入过来的支流. 这些支流 包括周边的生态影响,尽可能在小范围内解决. 但如果遇到弯急、水流复杂的情况,又该怎么办呢?”

CNR Voice of China

“The Pinglu Canal project is installing water control gates to manage water flow from over 30 tributaries into the main canal.”

Unlock the full story

Get a Pro subscription or above to see the live story progression and the full list of independent sources confirming each event as they happen.

Log in to upgrade