Live Demo Agent Trial
Live Demo Agent Trial Log In Sign Up
News Wire / economy

Vietnam Struggles With Waste Sorting Infrastructure

VOV1 Vietnam Hanoi 14d13d Impact 5

Vietnam plans to prioritize investment in 19 projects at Type 1 fishing ports between 2021 and 2030. Current limitations include infrastructure scale and logistics services. Local fishing ports are seeing increased activity with vehicles transporting materials like coconut trunks and branches to prepare for upcoming fishing seasons. Le Van Boi is noted as a local figure in the Phu Thuy region. Vietnam is focusing on 18 ongoing infrastructure projects covering 1,252 km. Key priorities include high-speed railway projects connecting North-South, Lao Cai-Hanoi, and Hai Phong-Hanoi, as well as Dong Dang-Hanoi routes. The government aims to complete projects without delays, including the Long Thanh airport and various seaport and waterway projects. President Tran Thanh Man led a delegation to offer flowers and incense at a martyr memorial on the anniversary of the liberation of the South.

Vietnam plans to prioritize investment in 19 projects at Type 1 fishing ports between 2021 and 2030. Current limitations include infrastructure scale and logistics services. Local fishing ports are seeing increased activity with vehicles transporting materials like coconut trunks and branches to prepare for upcoming fishing seasons. Le Van Boi is noted as a local figure in the Phu Thuy region. Vietnam is focusing on 18 ongoing infrastructure projects covering 1,252 km. Key priorities include high-speed railway projects connecting North-South, Lao Cai-Hanoi, and Hai Phong-Hanoi, as well as Dong Dang-Hanoi routes. The government aims to complete projects without delays, including the Long Thanh airport and various seaport and waterway projects. President Tran Thanh Man led a delegation to offer flowers and incense at a martyr memorial on the anniversary of the liberation of the South. Vietnam faces challenges enforcing waste sorting regulations due to inadequate infrastructure. Shortages of sorting bins and failure to separate waste during collection have been reported. Even when residents sort waste, it is reportedly mixed during transport. These issues have led to claims that penalties for non-compliance are unconvincing.

Topics

fishing industry infrastructure maritime economy

Developing

  1. 862d Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore.
  2. 862d Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur.
  3. 862d Excepteur sint occaecat cupidatat non proident, sunt in culpa qui officia deserunt mollit anim id est.
  4. 862d Sed ut perspiciatis unde omnis iste natus error sit voluptatem accusantium doloremque laudantium.

Sources · 7 independent

VOV1 Vietnam

“Trong giai đoạn 2021-2030 sẽ có 19 dự án được ưu tiên đầu tư tại các cảng cá loại 1, đặc biệt là tại 5 trung tâm nghề cá lớn”

VOV1 Vietnam

“hạn chế về quy mô kết cấu hạ tầng và dịch vụ hậu cần nghề cá. Các cơm thang, tại cảng cá phú hài phương phú thủy, không khí lao đậm cũng rộng ràng khẩn trường.”

VOV1 Vietnam

“Tập trung chỉ đạo có kế hoạch cụ thể triển khai các dự án đường sắt như dự án đường sắt tốc độ cao Bắc, Nam, Lào Cai Hàn Nội, Hải Phòng, Hàn Nội, Đồng Đăng, các đướng đường sắt tại Hàn Nội, Thành phố Chí Minh.”

VOV1 Vietnam

“Tuy nhiên, vẫn còn nhiều bất cặp. trong khi quyết định yêu cầu người dân phải phân loại giác thì ở nhiều nơi hệ thống hạ tầng lại chưa đáp ứng.”

Unlock the full story

Get a Pro subscription or above to see the live story progression and the full list of independent sources confirming each event as they happen.

Log in to upgrade